Opens in a new tab

Important: Northbound I-95 Exit Ramp to NW 2 Ave is Now at Exit 12B

Week of September 3, 2024

In Case You Missed It: New Ramp Update Video

As you drive east on the Palmetto Expressway heading toward the Golden Glades Interchange, you may have noticed the ongoing construction on the right-hand side and wondered what it’s for.

Click here or below for a progress update video on the new direct connect ramp from the Palmetto Expressway to I-95.

GGI Video New Ramp thumbnail

Project Closures

map closure September 1 2024
  • lane closure icon

    Lane Closure

  • local traffic only icon

    Detour

  • new traffic pattern icon

    New Traffic Pattern

Check Live Map

The following closures are scheduled between Tuesday, September 3, and Friday, September 6. These closures will allow crews to perform bridge work, roadway paving, I-95 median work and temporary concrete barrier wall installation.

Note: lane closures will be suspended from Friday, August 30 to Monday, September 2 for the Labor Day holiday.

I-95

  • Ramp Closure: NW 151 Street to southbound I-95
    From Tuesday, September 3 to Thursday, September 6 from 10 p.m. to 5 a.m., the ramp from NW 151 Street to southbound I-95 will be closed and traffic will be detoured as follows:
    • Continue south on SR 7/US 441/NW 7 Avenue
    • Turn left onto eastbound SR 916/NW 135 Street
    • Take the ramp onto southbound I-95 
  • Closure: southbound and northbound I-95 Express Lanes
    From Tuesday, September 3 to Thursday, September 6 from 10 p.m. to 5 a.m., drivers who want to take the northbound and southbound I-95 Express Lanes between NW 30 Street and NW 183 Street/Miami Gardens Drive, will be detoured to use the general purpose lanes along I-95.

  • Lane Closures: I-95 between NW 135 Street and the Golden Glades Interchange
    • At 9 p.m., one lane in both directions will be closed nightly as needed
    • At 11 p.m., a second lane in both directions will be closed nightly as needed
    • All lanes will reopen at 5 a.m.

Florida’s Turnpike

  • Ramp Closure: southbound Turnpike to westbound SR 826/Palmetto Expressway
    From Tuesday, September 3 to Thursday, September 6 from 10 p.m. to 5 a.m., the ramp from southbound Turnpike to westbound SR 826/Palmetto Expressway will be closed and traffic will be detoured as follows:
    • Continue south and take the ramp to I-95 and SR 7/US 441/NW 7 Avenue
    • Exit at SR 7/US 441/NW 7 Avenue and turn right onto northbound SR 7/US 441/NW 7 Avenue
    • Take the ramp to the Turnpike and westbound SR 826/Palmetto Expressway
    • Continue north and take the ramp to westbound SR 826/Palmetto Expressway
  • Lane Closures: Turnpike between SR 860/NW 183 Street/Miami Gardens Drive and I-95
    • From 9 p.m. to 5 a.m., up to two lanes in both directions will be closed nightly as needed
  • New Traffic Pattern: northbound Turnpike between the Golden Glades Interchange and SR 860/NW 183 Street/Miami Gardens Drive
    All three northbound lanes are shifted to the inside using the recently paved shoulder, then shifted to the existing lane configuration when going under the toll gantry and then back to the inside paved shoulder. This new traffic pattern will be in place for the remainder of the year to perform construction work on the outside lanes and swale area.

Palmetto Expressway

  • Ramp Closure: NW 167 Street to westbound SR 826/Palmetto Expressway
    From Tuesday, September 3 to Thursday, September 6 from 10 p.m. to 5 a.m., the ramp from NW 167 Street to westbound SR 826/Palmetto Expressway will be closed and traffic will be detoured as follows:
    • Take the ramp to northbound SR 7/US 441/NW 2 Avenue
    • Turn left onto westbound NW 7 Avenue Extension
    • Continue west for westbound SR 826/Palmetto Expressway
  • Lane Closures: Palmetto Expressway between NW 12 Avenue and NW 7 Avenue Extension
    • At 9 p.m., one lane in both directions will be closed nightly as needed
    • At 11 p.m., a second lane in both directions will be closed nightly as needed
    • All lanes will reopen at 5 a.m.

SR 7/US 441/NW 7 Avenue

  • Ramp Closure: SR 7/US 441/NW 7 Avenue to the Golden Glades Interchange 
    From Tuesday, September 3 to Thursday, September 6 from 10 p.m. to 5 a.m., the ramp from northbound SR 7/US 441/NW 7 Avenue to the Golden Glades Interchange will be closed and traffic will be detoured as follows:
    • Go south on SR 7/US 441/NW 7 Avenue
    • Turn left onto eastbound Opa-locka Boulevard
    • Take the ramp onto northbound I-95
  • New Traffic Pattern: SR 7/US 441/NW 7 Avenue between South Biscayne River Drive and Connector Road
    Northbound SR 7/US 441/NW 7 Avenue is reduced from two lanes to one lane, and southbound SR 7/US 441/NW 7 Avenue is reduced from three lanes to two lanes.

SR 9

  • Ramp Closure: SR 9 to the Golden Glades Interchange
    From Tuesday, September 3 to Thursday, September 6 from 10 p.m. to 5 a.m., the ramp from northbound SR 9 to the Golden Glades Interchange will be closed and traffic will be detoured as follows:
    • Go east on Opa-locka Boulevard 
    • Take the ramp onto northbound I-95

NW 151 Street

  • Full Closure: NW 151 Street between SR 7/US 441/NW 7 Avenue and I-95 
    From Tuesday, September 3 to Thursday, September 6 from 10 p.m. to 5 a.m., NW 151 Street will be closed in both directions.
  • All lanes along eastbound NW 151 Street will be closed nightly between SR 7/US 441/NW 7 Avenue and I-95 and traffic will be detoured as follows:
    • Go south on SR 7/US 441/NW 7 Avenue
    • Turn left onto eastbound SR 916/NW 135 Street
    • Turn left onto northbound NW 5 Avenue
    • Turn right onto eastbound NW 151 Street
  • All lanes along westbound NW 151 Street will be closed nightly between SR 7/US 441/NW 7 Avenue and I-95 and traffic will be detoured as follows:

NW 6 Avenue

  • Around-the-clock Full Closure: NW 6 Avenue between NW 151 Street and NW 162 Street
    Drivers and pedestrians who want to go north onto NW 6 Avenue from the intersection of NW 151 Street and NW 6 Avenue will be detoured as follows:
    • Go east along NW 151 Street
    • Turn right onto southbound South Biscayne River Drive
    • Take the third exit at the roundabout onto northbound North Miami Avenue
    • Turn left onto northbound Memorial Highway, which converts to NW 2 Avenue
    • Continue north along NW 2 Avenue to NW 165 Street
  • Drivers and pedestrians who want to go south onto NW 6 Avenue from the intersection of NW 165 Street and NW 2 Avenue will be detoured as follows: 
    • Continue south along NW 2 Avenue, which converts to Memorial Highway
    • Turn right onto southbound North Miami Avenue
    • Turn right onto northbound South Biscayne River Drive
    • Turn left onto westbound NW 151 Street
    • Continue west along NW 151 Street to NW 6 Avenue

      Click here for more information and to download the detour map.

Project Progress

Below is a photograph facing east of the ongoing bridge work at southbound I-95 over the Biscayne Canal to create additional capacity.

Photograph facing east of the ongoing bridge work at southbound I-95 over the Biscayne Canal to create additional capacity (September 2024)

Join Us in the Community

Friday, September 6, 2024
3 p.m. to 5 p.m.
Family Dollar
14941 NW 7 Avenue
Miami, FL 33168

Meet team members and learn the latest about the GGI Project, including upcoming work and lane closures. Ask questions and stay informed. Click here for more information.

GGI Pop-up event on 8.9.24