The following closures are scheduled between Sunday, October 26 and Friday, October 31. These closures will allow crews to perform bridge work, roadway paving, drainage work and temporary concrete barrier wall installation.
I-95
- Ramp Closure: northbound I-95 to westbound SR 826/Palmetto Expressway
On Monday, October 27 between 10 p.m. and 5 a.m., the ramp from northbound I-95 to westbound SR 826/Palmetto Expressway will be closed and traffic will be detoured as follows:- Continue north along I-95 and take the ramp to SR 7/US 441/NW 2 Avenue
- Turn left onto westbound NW 7 Avenue Extension
- Continue west for westbound SR 826/Palmetto Expressway
- Ramp Closure: northbound I-95 to NW 167 Street
On Monday, October 27 from 10 p.m. to 5 a.m., the ramp from northbound I-95 to NW 167 Street will be closed and traffic will be detoured as follows:- Continue north on I-95
- Exit at SR 860/NE 183 Street/Miami Gardens Drive
- Turn right onto SR 860/NE 183 Street/Miami Gardens Drive
- Turn left onto southbound SR 915/NE 6 Avenue to access NW/NE 167 Street
- Full Closure: northbound I-95 at SR 916/NW 135 Street
On Tuesday, October 28 and Wednesday, October 29 between 10:30 p.m. and 5 a.m., all lanes along northbound I-95 will be closed at SR 916/NW 135 Street and traffic will be detoured as follows:- Exit at SR 916/NW 135 Street and go north on NW 6 Avenue
- Turn left onto westbound SR 916/Opa-locka Boulevard
- Turn right onto northbound SR 7/US 441/NW 7 Avenue
- Take the ramp to eastbound SR 826 Beaches/NW 167 Street
- Turn left onto northbound SR 915/NE 6 Avenue
- Turn right onto eastbound SR 860/NE 183 Street/Miami Gardens Drive
- Take the ramp onto northbound I-95
- Around-the-clock Ramp Closure: northbound I-95 exit to NW 151 Street
The exit ramp from northbound I-95 onto NW 151 Street (Exit 11) remains closed through summer 2026. Traffic is directed to use the next exit ramp onto eastbound SR 826/NW 167 Street (Exit 12B) or also the previous exit onto SR 916/NW 135 Street (Exit 10B).
- Lane Closures: I-95 between NW 135 Street and the Golden Glades Interchange
- At 9 p.m., one lane in both directions will be closed nightly as needed
- At 11 p.m., a second lane in both directions will be closed nightly as needed
- All lanes will reopen at 5 a.m.
Florida’s Turnpike
- Ramp Closure: southbound Florida’s Turnpike to NW 167 Street
On Monday, October 27 between 10 p.m. and 5 a.m., the ramp from southbound Florida’s Turnpike to NW 167 Street will be closed, and traffic will be detoured as follows:- Take the ramp to southbound I-95
- Exit at SR 7/US 441/NW 7 Avenue
- Turn right onto northbound SR 7/US 441/NW 7 Avenue
- Take the ramp to SR 826 Beaches for NW 167 Street
- Lane Closures: Florida’s Turnpike between SR 860/NW 183 Street/Miami Gardens Drive and I-95
- From 9 p.m. to 5 a.m., up to two lanes in both directions will be closed nightly as needed
SR 826/Palmetto Expressway
- Full Closure: westbound SR 826/Palmetto Expressway at NW 7 Avenue Extension
On Sunday, October 26 between 10 p.m. and 5 a.m., all lanes along westbound SR 826/Palmetto Expressway will be closed at NW 7 Avenue Extension and traffic will be detoured as follows:- Take the ramp to northbound SR 7/US 441/NW 2 Avenue
- Continue north on SR 7/US 441/NW 2 Avenue and turn left onto westbound SR 860/NW 183 Street/Miami Gardens Drive
- Turn left onto southbound SR 817/NW 27 Avenue
- Take the ramp to westbound SR 826/Palmetto Expressway
- Ramp Closure: eastbound SR 826/Palmetto Expressway to NW 167 Street
On Monday, October 27 between 10 p.m. and 5 a.m., the ramp from eastbound SR 826/Palmetto Expressway to NW 167 Street will be closed and traffic will be detoured as follows:- Take the ramp to SR 7/US 441/NW 7 Avenue
- Turn right onto northbound SR 7/US 441/NW 7 Avenue
- Take the ramp to SR 826 Beaches for NW 167 Street
- Traffic Shift: ramp from eastbound SR 826/Palmetto Expressway to the NW 167 Street and NW 2 Avenue intersection
- A newly completed bridge is now open for the ramp from eastbound SR 826/Palmetto Expressway to the NW 167 Street and NW 2 Avenue intersection.
- Traffic has been shifted to the new ramp as part of the GGI Project improvements.
- The new ramp is located just south of the old ramp.
- Lane Closures: SR 826/Palmetto Expressway between NW 12 Avenue and NW 7 Avenue Extension
- At 9 p.m., one lane in both directions will be closed nightly as needed
- At 11 p.m., a second lane in both directions will be closed nightly as needed
- All lanes will reopen at 5 a.m.
SR 7/US 441/NW 7 Avenue
- Ramp Closure: northbound SR 7/US 441/NW 7 Avenue to westbound SR 826/Palmetto Expressway
On Monday, October 27 between 10 p.m. to 5 a.m., the ramp from SR 7/US 441/NW 7 Avenue to westbound SR 826/Palmetto Expressway will be closed and traffic will be detoured as follows:- Continue north and take the ramp to northbound SR 7/US 441/NW 2 Avenue
- Turn left onto westbound NW 7 Avenue Extension
- Continue west for westbound SR 826/Palmetto Expressway
- Ramp Closure: northbound SR 7/US 441/NW 7 Avenue to northbound I-95
On Tuesday, October 28 between 10:30 p.m. and 5 a.m., the ramp from northbound SR 7/US 441/NW 7 Avenue to northbound I-95 will be closed and traffic will be detoured as follows:- Take the ramp to eastbound SR 826 Beaches/NW 167 Street
- Turn left onto northbound SR 915/NE 6 Avenue
- Turn right onto eastbound SR 860/NE 183 Street/Miami Gardens Drive
- Take the ramp onto northbound I-95
SR 9
- Ramp Closure: northbound SR 9 to westbound SR 826/Palmetto Expressway
On Monday, October 27 between 10 p.m. to 5 a.m., the ramp from northbound SR 9 to westbound SR 826/Palmetto Expressway will be closed and traffic will be detoured as follows:- Continue north and take the ramp to northbound SR 7/US 441/NW 2 Avenue
- Turn left onto westbound NW 7 Avenue Extension
- Continue west for westbound SR 826/Palmetto Expressway
NW 151 Street
- Full Closure: NW 151 Street at the I-95 bridge
From Monday, October 27 to Thursday, October 30 between 10 p.m. and 5 a.m., NW 151 Street will be closed in both directions:
- All lanes along eastbound NW 151 Street will be closed at the I-95 bridge and traffic will be detoured as follows:
- Go south on SR 7/US 441/NW 7 Avenue
- Turn left onto eastbound SR 916/NW 135 Street
- Turn left onto northbound NW 5 Avenue
- Turn right onto eastbound NW 151 Street
- All lanes along westbound NW 151 Street will be closed at the I-95 bridge and traffic will be detoured as follows:
- Go south on NW 5 Avenue
- Turn right onto westbound SR 916/NW 135 Street
- Turn right onto northbound SR 7/US 441/NW 7 Avenue
- Turn left onto westbound NW 151 Street
SR 7/US 441/NW 2 Avenue
- Ramp Closure: southbound SR 7/US 441/NW 2 Avenue to NW 167 Street
On Monday, October 27 between 10 p.m. and 5 a.m., the ramp from southbound SR 7/US 441/NW 2 Avenue to NW 167 Street will be closed and traffic will be detoured as follows:- Take the ramp to southbound SR 7/US 441/NW 7 Avenue
- Make a U-turn at NW 151 Street
- Go north on SR 7/US 441/NW 7 Avenue
- Take the ramp to SR 826 Beaches for NW 167 Street
NW 167 Street
- Ramp Closure: NW 167 Street to westbound SR 826/Palmetto Expressway
On Wednesday, October 29 between 10 p.m. to 5 a.m., the ramp from NW 167 Street to westbound SR 826/Palmetto Expressway will be closed and traffic will be detoured as follows:- Take the ramp to northbound SR 7/US 441/NW 2 Avenue
- Turn left onto westbound NW 7 Avenue Extension
- Continue west for westbound SR 826/Palmetto Expressway
- Ramp Closure: NW 167 Street to I-95, SR 9 and SR 7/US 441/NW 7 Avenue
On Wednesday, October 29 between 10 p.m. and 5 a.m., the ramp from NW 167 Street to southbound I-95, SR 9 and SR 7/US 441/NW 7 Avenue will be closed and traffic will be detoured as follows:- Take the ramp to northbound SR 7/US 441/NW 2 Avenue
- Turn left onto westbound NW 7 Avenue Extension
- Continue west for westbound SR 826/Palmetto Expressway
- Exit at NW 12 Avenue and turn left onto southbound NW 12 Avenue
- Turn left onto eastbound NW 167 Street
- Take the ramp to southbound I-95 and SR 7/US 441/NW 7 Avenue
- Updated Traffic Pattern: NW 167 Street and NW 2 Avenue Intersection
- Northbound NW 2 Avenue is reduced to one exclusive left turn lane. This is a temporary configuration to continue reconstructing the Golden Glades Interchange.
- The right turn lane from eastbound NW 167 Street to southbound NW 2 Avenue is temporarily unavailable. Please continue east and turn right at NW 1 Avenue or North Miami Avenue.
NW 7 Avenue
- Lane Closure: NW 7 Avenue between NW 7 Avenue Extension and NW 172 Street
From Monday, October 27 to Friday, October 31 between 9 a.m. and 3 p.m., one lane will be closed along NW 7 Avenue between NW 7 Avenue Extension and NW 172 Street. One lane will remain open.
SR 112/Airport Expressway
- Lane Closures: SR 112/Airport Expressway between NW 22 Avenue and I-95
- At 10 p.m., one lane in both directions will be closed nightly as needed
- At 11 p.m., a second lane in both directions will be closed nightly as needed
- All lanes will reopen at 5 a.m.
NW 171 Terrace
- Around-the-clock Full Closure: NW 171 Terrace
NW 171 Terrace between NW 2 Court and NW 2 Avenue remains closed around the clock through early 2027 for overhead bridge work. Traffic is being detoured to NW 7 Avenue Extension.
NW 6 Avenue
- Around-the-clock Full Closure: NW 6 Avenue between NW 151 Street and NW 162 Street
Drivers and pedestrians who want to go north onto NW 6 Avenue from the intersection of NW 151 Street and NW 6 Avenue will be detoured as follows:- Go east along NW 151 Street
- Turn right onto southbound South Biscayne River Drive
- Take the third exit at the roundabout onto northbound North Miami Avenue
- Turn left onto northbound Memorial Highway, which converts to NW 2 Avenue
- Continue north along NW 2 Avenue to NW 165 Street
- Drivers and pedestrians who want to go south onto NW 6 Avenue from the intersection of NW 165 Street and NW 2 Avenue will be detoured as follows:
- Continue south along NW 2 Avenue, which converts to Memorial Highway
- Turn right onto southbound North Miami Avenue
- Turn right onto northbound South Biscayne River Drive
- Turn left onto westbound NW 151 Street
- Continue west along NW 151 Street to NW 6 Avenue
Project Progress
Below is a photograph facing south of the pile driving foundation work for the new northbound I-95 bridge over the Biscayne Canal as part of the ongoing widening work.