Important: Northbound I-95 Exit Ramp to NW 2 Ave is Now at Exit 12B

Week of October 13, 2024

Video: NW 6 Avenue Update

Check out the ongoing work along NW 6 Avenue, where a new stormwater drainage system is being installed to strengthen the corridor’s resilience.

Click here or below for the NW 6 Avenue Update Video.

NW 6 Ave Thumbnail Oct 11 2024

Project Closures

Map closure October 11 2024
  • lane closure icon

    Lane Closure

  • local traffic only icon

    Detour

  • new traffic pattern icon

    New Traffic Pattern

Check Live Map

The following closures are scheduled between Sunday, October 13, and Friday, October 18. These closures will allow crews to perform bridge work, roadway paving, I-95 median work, utility work and temporary concrete barrier wall installation.

I-95

  • Ramp Closure: NW 2 Avenue to northbound I-95
    On Friday, October 18 between 10 p.m. and 5 a.m., the ramp from NW 2 Avenue to northbound I-95 will be closed and traffic will be detoured as follows:
    • Turn right onto eastbound NW 168 Street
    • Turn right onto southbound North Miami Avenue
    • Turn left onto eastbound NW 167 Street
    • Turn left onto northbound SR 915/NE 6 Avenue
    • Turn right onto eastbound SR 860/NW 183 Street/Miami Gardens Drive
    • Take the ramp to northbound I-95
  • Lane Closures: I-95 between NW 135 Street and the Golden Glades Interchange
    • At 9 p.m., one lane in both directions will be closed nightly as needed
    • At 11 p.m., a second lane in both directions will be closed nightly as needed
    • All lanes will reopen at 5 a.m.

Florida’s Turnpike

  • Ramp Closure: southbound Turnpike to westbound SR 826/Palmetto Expressway
    From Sunday, October 13 to Thursday, October 17 from 10 p.m. to 5 a.m., the ramp from southbound Turnpike to westbound SR 826/Palmetto Expressway will be closed and traffic will be detoured as follows:
    • Continue south and take the ramp to I-95 and SR 7/US 441/NW 7 Avenue
    • Exit at SR 7/US 441/NW 7 Avenue and turn right onto northbound SR 7/US 441/NW 7 Avenue
    • Take the ramp to the Turnpike and westbound SR 826/Palmetto Expressway
    • Continue north and take the ramp to westbound SR 826/Palmetto Expressway
  • Lane Closures: Turnpike between SR 860/NW 183 Street/Miami Gardens Drive and I-95
    • From 9 p.m. to 5 a.m., up to two lanes in both directions will be closed nightly as needed
  • New Traffic Pattern: northbound Turnpike between the Golden Glades Interchange and SR 860/NW 183 Street/Miami Gardens Drive
    All three northbound lanes are shifted to the inside using the recently paved shoulder, then shifted to the existing lane configuration when going under the toll gantry and then back to the inside paved shoulder.

Palmetto Expressway

  • Ramp Closure: NW 167 Street to westbound SR 826/Palmetto Expressway
    From Sunday, October 13 to Thursday, October 17 from 10 p.m. to 5 a.m., the ramp from NW 167 Street to westbound SR 826/Palmetto Expressway will be closed and traffic will be detoured as follows:
    • Take the ramp to northbound SR 7/US 441/NW 2 Avenue
    • Turn left onto westbound NW 7 Avenue Extension
    • Continue west for westbound SR 826/Palmetto Expressway
  • Lane Closures: Palmetto Expressway between NW 12 Avenue and NW 7 Avenue Extension
    • At 9 p.m., one lane in both directions will be closed nightly as needed
    • At 11 p.m., a second lane in both directions will be closed nightly as needed
    • All lanes will reopen at 5 a.m.

NW 12 Avenue/NW 13 Avenue

  • Full Closure: NW 12 Avenue/NW 13 Avenue at SR 826/Palmetto Expressway
    From Wednesday, October 16 to Friday, October 18 between 10 p.m. and 5 a.m., NW 12 Avenue/NW 13 Avenue will be closed in both directions.
  • All lanes along northbound NW 12 Avenue/NW 13 Avenue will be closed at SR 826/Palmetto Expressway and traffic will be detoured as follows:
    • Turn left onto westbound NW 165 Street
    • Turn right onto northbound NW 16 Court
    • For eastbound SR 826/Palmetto Expressway or eastbound NW 167 Street, turn right onto the entrance ramp
    • For westbound SR 826/Palmetto Expressway, turn left onto westbound NW 167 Street, turn right onto northbound NW 17 Avenue and turn left onto the
    • entrance ramp
    • For northbound NW 12 Avenue, turn left onto westbound NW 167 Street, turn right onto northbound NW 17 Avenue and turn right onto eastbound NW 175 Street
  • All lanes along southbound NW 12 Avenue/NW 13 Avenue will be closed at SR 826/Palmetto Expressway and traffic will be detoured as follows:
    • Turn right onto westbound NW 167 Street
    • Turn left onto southbound NW 17 Avenue
    • For eastbound SR 826/Palmetto Expressway, turn left onto the entrance ramp
    • For southbound NW 13 Avenue, turn left onto eastbound NW 167 Street

SR 7/US 441/NW 7 Avenue

  • Ramp Closure: Golden Glades Interchange to SR 7/US 441/NW 7 Avenue
    From Sunday, October 13 to Friday, October 18 from 10 p.m. to 5 a.m., the ramp from the Golden Glades Interchange to southbound SR 7/US 441/NW 7 Avenue will be closed and traffic will be detoured as follows:
    • Take the ramp to southbound I-95
    • Exit at SR 916/Opa-locka Boulevard and turn right onto westbound SR 916/Opa-locka Boulevard
    • Turn left onto southbound SR 7/US 441/NW 7 Avenue
  • Ramp Closure: SR 7/US 441/NW 7 Avenue to the Golden Glades Interchange
    On Wednesday, October 16 from 10 p.m. to 5 a.m., the ramp from northbound SR 7/US 441/NW 7 Avenue to the Golden Glades Interchange will be closed and traffic will be detoured as follows:
    • Go south on SR 7/US 441/NW 7 Avenue
    • Turn left onto eastbound Opa-locka Boulevard
    • Take the ramp onto northbound I-95

SR 9

  • Ramp Closure: Golden Glades Interchange to SR 9
    From Sunday, October 13 to Friday, October 18 from 10 p.m. to 5 a.m., the ramp from the Golden Glades Interchange to southbound SR 9 will be closed and traffic will be detoured as follows:
    • Take the ramp to southbound SR 9A/I-95
    • Exit at SR 916/Opa-locka Boulevard and turn right onto westbound SR 916/Opa-locka Boulevard
    • Turn right onto northbound NW 22 Avenue or continue west and turn right onto northbound NW 27 Avenue to access SR 9
  • Ramp Closure: SR 9 to the Golden Glades Interchange
    On Wednesday, October 16 from 10 p.m. to 5 a.m., the ramp from northbound SR 9 to the Golden Glades Interchange will be closed and traffic will be detoured as follows:
    • Go east on Opa-locka Boulevard
    • Take the ramp onto northbound I-95

NW 167 Street

  • Full Closure: NW 167 Street between NW 12 Avenue/NW 13 Avenue and NW 10 Avenue
    On Thursday, October 17 between 9 p.m. and 5 a.m., eastbound NW 167 Street will be closed and traffic will be detoured as follows:
    • Go south on NW 12 Avenue/NW 13 Avenue
    • Turn left onto eastbound NW 165 Street
    • Turn left onto northbound NW 163 Drive to access NW 10 Avenue

NW 6 Court

  • Full Closure: NW 6 Court between SR 916/Opa-locka Boulevard and SR 916/NW 135 Street
    On Sunday, October 13 to Friday, October 18 between 10 p.m. and 5 a.m., eastbound NW 6 Court will be closed and traffic will be detoured as follows:
    • Turn right onto westbound SR 916/Opa-locka Boulevard
    • Turn left onto southbound SR 7/US 441/NW 7 Avenue
    • Turn left onto eastbound SR 916/NW 135 Street to access NW 6 Court

NW 6 Avenue

  • Around-the-clock Full Closure: NW 6 Avenue between NW 151 Street and NW 162 Street
    Drivers and pedestrians who want to go north onto NW 6 Avenue from the intersection of NW 151 Street and NW 6 Avenue will be detoured as follows:
    • Go east along NW 151 Street
    • Turn right onto southbound South Biscayne River Drive
    • Take the third exit at the roundabout onto northbound North Miami Avenue
    • Turn left onto northbound Memorial Highway, which converts to NW 2 Avenue
    • Continue north along NW 2 Avenue to NW 165 Street
  • Drivers and pedestrians who want to go south onto NW 6 Avenue from the intersection of NW 165 Street and NW 2 Avenue will be detoured as follows:
    • Continue south along NW 2 Avenue, which converts to Memorial Highway
    • Turn right onto southbound North Miami Avenue
    • Turn right onto northbound South Biscayne River Drive
    • Turn left onto westbound NW 151 Street
    • Continue west along NW 151 Street to NW 6 Avenue

Project Progress

Below is a photograph facing east of the nine bridge beams that were recently installed to continue constructing the new ramp that will connect the Palmetto Expressway and Florida’s Turnpike to/from the intersection of NW 167 Street and NW 2 Avenue.

The nine bridge beams that were recently installed to  the new ramp that will connect the Palmetto Expressway and Florida’s Turnpike

Join Us in the Community

Friday, October 25, 2024
12 p.m. to 2 p.m.
Aladdin Supermarket
20 NE 167 Street
Miami, FL 33162

Meet team members and learn the latest about the GGI Project, including upcoming work and lane closures. Ask questions and stay informed.