Attention: NW 6 Ave is closed from NW 151 St to NW 162 St

Click here for details and detour map

Coming soon

This site is currently undergoing development, and the information you see is not final.

    Week of May 19, 2024

    Hybrid Public Meeting

    Thank you for joining us at the public meeting. If you missed it, feel free to view the meeting recording by clicking the thumbnail below or click here.

    To download the meeting presentation, please click here.

    GGI Meeting Post graphic

    Project Closures

    map closure for may 19
    • Lane Closure

    • Detour

    • New Traffic Pattern

    Check Live Map

    The following closures are scheduled between Sunday, May 19, and Thursday, May 23. 

    All lanes and ramps will reopen at 5 a.m. These closures will allow crews to perform bridge work, roadway paving and temporary concrete barrier wall installation.

    I-95

    • Closure: southbound and northbound I-95 Express Lanes
      From Sunday, May 19, to Thursday, May 23, from 11 p.m. to 5 a.m., drivers who want to take the northbound and southbound I-95 Express Lanes between NW 30 Street and NW 183 Street/Miami Gardens Drive, will be detoured to use the general purpose lanes along I-95.
    • Lane Closures: I-95 between NW 135 Street and the Golden Glades Interchange
      • From 11 p.m. to 5 a.m., up to two lanes in both directions will be closed nightly as needed

    Florida’s Turnpike

    • Lane Closures: Turnpike between NW 183 Street/Miami Gardens Drive and I-95
      • From 9 p.m. to 5 a.m., up to two lanes in both directions will be closed nightly as needed
    • No impact to tolling operations anticipated

    Palmetto Expressway

    • Lane Closures: Palmetto Expressway between NW 12 Avenue and NW 7 Avenue Extension
      • At 9 p.m., one lane in both directions will be closed nightly as needed
      • At 11 p.m., a second lane in both directions will be closed nightly as needed
      • All lanes will reopen at 5 a.m.

    SR 9

    • Ramp Closure: northbound SR 9 to the interchange
      From Sunday, May 19, to Thursday, May 23, from 11 p.m. to 5 a.m., the ramp from northbound SR 9 to the interchange will be closed, and traffic will be detoured as follows:
      • Go east on NW 135 Street 
      • Take the ramp onto northbound I-95

    SR 7/US 441/NW 7 Avenue/NW 2 Avenue

    • Ramp Closure: northbound SR 7/US 441/NW 7 Avenue to the interchange
      On Wednesday, May 22, and Thursday, May 23, from 11 p.m. to 5 a.m., the ramp from NW 7 Avenue to the interchange will be closed, and traffic will be detoured as follows:
      • Go south on SR 7/US 441/NW 7 Avenue
      • Turn left onto eastbound NW 135 Street
      • Take the ramp onto northbound I-95
    • Ramp Closure: southbound SR 7/US 441/NW 2 Avenue to southbound I-95
      From Sunday, May 19, to Thursday, May 23, from 11 p.m. to 5 a.m., the ramp from NW 2 Avenue to southbound I-95 will be closed, and traffic will be detoured as follows:
      • Continue south along SR 7/US 441/NW 2 Avenue, which converts to SR 7/US 441/NW 7 Avenue
      • Turn left onto eastbound NW 135 Street
      • Take the ramp onto southbound I-95   

    NW 167 Street

    • Ramp Closure: NW 167 Street to southbound I-95
      From Sunday, May 19, to Thursday, May 23, from 11 p.m. to 5 a.m., the ramp from NW 167 Street to southbound I-95 will be closed, and traffic will be detoured as follows:
      • Continue west and take the ramp to westbound Palmetto Expressway
      • Exit at NW 12 Avenue and turn left onto southbound NW 12 Avenue
      • Turn left onto eastbound NW 167 Street and take the ramp onto eastbound Palmetto Expressway
      • Take the ramp to southbound I-95
    • Ramp Closure: NW 167 Street to westbound Palmetto Expressway
      On Wednesday, May 22, and Thursday, May 23, from 11 p.m. to 5 a.m., the ramp from NW 167 Street to westbound Palmetto Expressway will be closed, and traffic will be detoured as follows:
      • Go north onto SR 7/US 441/NW 2 Avenue
      • Turn left onto westbound NW 7 Avenue Extension
      • Continue west for westbound Palmetto Expressway

    Project Progress

    Below is a photograph facing south of the ramp that connects the Turnpike and Palmetto Expressway to I-95 and SR 7/US 441/NW 7 Avenue. The middle lane has returned to being a choice lane, which means drivers in the middle lane can continue south to I-95 or exit at SR 7/US 441/NW 7 Avenue.

    Photograph facing south of the ramp that connects the Turnpike and Palmetto Expressway to I-95 and SR 7/US 441/NW 7 Avenue. The middle lane has returned to being a choice lane, which means drivers in the middle lane can continue south to I-95 or exit at SR 7/US 441/NW 7 Avenue (May 2024)