Attention: NW 6 Ave is closed from NW 151 St to NW 162 St

Click here for details and detour map

Coming soon

This site is currently undergoing development, and the information you see is not final.

    Week of May 12, 2024

    Hybrid Public Meeting

    Thank you for joining us at the public meeting. If you missed it, feel free to view the meeting recording by clicking the thumbnail below or click here.

    To download the meeting presentation, please click here.

    a screenshot of the hybrid meeting held on May 9 2024

    Project Closures

    map closures of the week may 12 2024
    • Lane Closure

    • Detour

    • New Traffic Pattern

    Check Live Map

    The following closures are scheduled between Sunday, May 12, and Friday, May 17. 

    All lanes and ramps will reopen at 5 a.m. These closures will allow crews to perform bridge work, roadway paving and temporary concrete barrier wall installation.

    I-95

    • Ramp Closure: Opa-locka Boulevard to northbound I-95
      From Sunday, May 12, to Friday, May 17, from 11:59 p.m. to 5 a.m., the ramp from Opa-locka Boulevard to northbound I-95 will be closed and traffic will be detoured as follows:
      • Go north on SR 7/US 441/NW 7 Avenue
      • Take the ramp for northbound I-95 at the Golden Glades Interchange
    • Closure: southbound and northbound I-95 Express Lanes
      From Sunday, May 12, to Friday, May 17, from 11 p.m. to 5 a.m., drivers who want to take the northbound and southbound I-95 Express Lanes between NW 30 Street and NW 183 Street/Miami Gardens Drive, will be detoured to use the general purpose lanes along I-95.
    • Lane Closures: I-95 between NW 135 Street and the Golden Glades Interchange
      • From 11 p.m. to 5 a.m., up to two lanes in both directions will be closed nightly as needed

    Florida’s Turnpike

    • Ramp Closure: southbound Turnpike to southbound I-95
      From Sunday, May 12, to Friday, May 17, from 11 p.m. to 5 a.m., the ramp from southbound Turnpike to southbound I-95 will be closed, and traffic will be detoured as follows:
      • Continue south on the Turnpike to exit at NW 167 Street
      • Turn right onto southbound NE 6 Avenue
      • Turn right onto westbound Opa-locka Boulevard
      • Take the ramp for southbound I-95
    • Lane Closures: Turnpike between NW 183 Street/Miami Gardens Drive and I-95
      • From 9 p.m. to 5 a.m., up to two lanes in both directions will be closed nightly as needed
    • No impact to tolling operations anticipated

    Palmetto Expressway

    • Ramp Closure: eastbound Palmetto Expressway to southbound I-95
      From Sunday, May 12, to Friday, May 17, from 11 p.m. to 5 a.m., the ramp from eastbound Palmetto Expressway to southbound I-95 will be closed, and traffic will be detoured as follows:
      • Continue east on Palmetto Expressway to NW 7 Avenue Extension
      • Turn right onto SR 7/US 441/NW 2 Avenue
      • Take the ramp for southbound I-95
    • Lane Closures: Palmetto Expressway between NW 12 Avenue and NW 7 Avenue Extension
      • At 9 p.m., one lane in both directions will be closed nightly as needed
      • At 11 p.m., a second lane in both directions will be closed nightly as needed
      • All lanes will reopen at 5 a.m.

    SR 9

    • Ramp Closure: northbound SR 9 to the interchange
      From Sunday, May 12, to Friday, May 17, from 11 p.m. to 5 a.m., the ramp from northbound SR 9 to the interchange will be closed, and traffic will be detoured as follows:
      • Go east on Opa-locka Boulevard 
      • Take the ramp onto northbound I-95

    SR 7/US 441/NW 7 Avenue

    • Ramp Closure: northbound SR 7/US 441/NW 7 Avenue to the interchange
      From Sunday, May 12, to Friday, May 17, from 11 p.m. to 5 a.m., the ramp from NW 7 Avenue to the interchange will be closed, and traffic will be detoured as follows:
      • Go south on SR 7/US 441/NW 7 Avenue
      • Turn left onto eastbound Opa-locka Boulevard
      • Take the ramp onto northbound I-95

    Project Progress

    Below is a photograph facing east of the ongoing bridge foundation work to build a new ramp to connect the Palmetto Expressway and Turnpike to/from the intersection of NW 167 Street and NW 2 Avenue.

    Photograph facing east of the ongoing bridge foundation work to build a new ramp to connect the Palmetto Expressway and Turnpike to/from the intersection of NW 167 Street and NW 2 Avenue (May 2024)