Important: Northbound I-95 Exit Ramp to NW 2 Ave is Now at Exit 12B

Week of March 30, 2025

On Monday, March 31 between 10 p.m. and 5 a.m., all lanes on SR 826/Palmetto Expressway will be closed at NW 7 Avenue Extension.

On Friday, April 4 and Saturday, April 5 between 10 p.m. and 8 a.m., all lanes on southbound I-95 will be closed at Exit 12 (NW 171 Street). Please see below for the detour routes.

Follow us on 𝕏 @GoGGI_FDOT for the latest project updates.

Project Closures

Map closure March 28 2025
  • lane closure icon

    Lane Closure

  • local traffic only icon

    Detour

  • new traffic pattern icon

    New Traffic Pattern

Check Live Map

The following closures are scheduled between Sunday, March 30 and Saturday, April 5. These closures will allow crews to perform bridge work, roadway paving, drainage work and temporary concrete barrier wall installation.

I-95

  • Full Closure: southbound I-95 at Exit 12 (NW 171 Street)
    On Friday, April 4 and Saturday, April 5 between 10 p.m. and 8 a.m.,all lanes along southbound I-95 will be closed at Exit 12 and traffic will be detoured as follows:
    • Take the ramp onto southbound SR 7/US 441/NW 7 Avenue
    • Turn left onto eastbound SR 916/NW 135 Street
    • Take the ramp onto southbound I-95
  • Closure: northbound I-95 Express Lanes
    From Sunday, March 30 to Thursday, April 3 between 11 p.m. and 5 a.m., drivers who want to take the northbound I-95 Express Lanes between NW 30 Street and SR 860/NE 183 Street/Miami Gardens Drive will be detoured to use the general purpose lanes along I-95.
  • Around-the-clock Ramp Closure: NW 151 Street to southbound I-95
    The ramp from NW 151 Street to southbound I-95 is closed through April 2025 and traffic is detoured as follows:
    • Go south on SR 7/US 441/NW 7 Avenue
    • Turn left onto eastbound SR 916/NW 135 Street
    • Take the ramp onto southbound I-95
  • Lane Closures: I-95 between NW 135 Street and the Golden Glades Interchange
    • At 9 p.m., one lane in both directions will be closed nightly as needed
    • At 11 p.m., a second lane in both directions will be closed nightly as needed
    • All lanes will reopen at 5 a.m.

Florida’s Turnpike

  • Lane Closures: Florida’s Turnpike between SR 860/NW 183 Street/Miami Gardens Drive and I-95
    • From 9 p.m. to 5 a.m., up to two lanes in both directions will be closed nightly as needed

Palmetto Expressway

  • Full Closure: westbound Palmetto Expressway at NW 7 Avenue Extension
    On Monday, March 31 between 10 p.m. and 5 a.m., all lanes along westbound Palmetto Expressway will be closed at NW 7 Avenue Extension and traffic will be detoured as follows:
    • Take the ramp to northbound SR 7/US 441/NW 2 Avenue
    • Continue north on SR 7/US 441/NW 2 Avenue and turn left onto westbound SR 860/NW 183 Street/Miami Gardens Drive
    • Turn left onto southbound SR 817/NW 27 Avenue
    • Take the ramp to westbound SR 826/Palmetto Expressway
  • Full Closure: eastbound Palmetto Expressway at NW 7 Avenue Extension
    On Monday, March 31 between 10 p.m. and 5 a.m., all lanes along eastbound Palmetto Expressway will be closed at NW 7 Avenue Extension and traffic will be detoured as follows:
    • Continue east and take the ramp to I-95 and southbound SR 7/US 441/NW 7 Avenue
    • Exit at SR 7/US 441/NW 7 Avenue and turn right onto northbound SR 7/US 441/NW 7 Avenue
    • Take the ramp to northbound SR 7/US 441/NW 2 Avenue
    • Continue north and make a left for NW 7 Avenue Extension
  • Lane Closures: Palmetto Expressway between NW 12 Avenue and NW 7 Avenue Extension
    • At 9 p.m., one lane in both directions will be closed nightly as needed
    • At 11 p.m., a second lane in both directions will be closed nightly as needed
    • All lanes will reopen at 5 a.m.

SR 7/US 441/NW 7 Avenue

  • Updated Traffic Pattern: SR 7/US 441/NW 7 Avenue between South Biscayne River Drive and Connector Road
    Northbound SR 7/US 441/NW 7 Avenue is reduced from two lanes to one lane, and southbound SR 7/US 441/NW 7 Avenue is reduced from three lanes to two lanes. The exclusive bicycle lane is temporarily unavailable during this work phase.

SR 7/US 441/NW 2 Avenue

  • Ramp Closure: SR 7/US 441/NW 2 Avenue to I-95
    On Sunday, March 30 and Monday, March 31 from 10 p.m. to 5 a.m., the ramp from southbound SR 7/US 441/NW 2 Avenue to southbound I-95 will be closed and traffic will be detoured as follows:
    • Take the ramp to southbound SR 7/US 441/NW 7 Avenue
    • Continue south on SR 7/US 441/NW 7 Avenue
    • Turn left onto eastbound NW 151 Street
    • Take the ramp to southbound I-95

NW 151 Street

  • Full Closure: NW 151 Street between SR 7/US 441/NW 7 Avenue and I-95
    On Monday, March 31 between 10 p.m. and 5 a.m., NW 151 Street will be closed in both directions.
  • All lanes along eastbound NW 151 Street will be closed between SR 7/US 441/NW 7 Avenue and I-95 and traffic will be detoured as follows:
    • Go south on SR 7/US 441/NW 7 Avenue
    • Turn left onto eastbound SR 916/NW 135 Street
    • Turn left onto northbound NW 5 Avenue
    • Turn right onto eastbound NW 151 Street
  • All lanes along westbound NW 151 Street will be closed between SR 7/US 441/NW 7 Avenue and I-95 and traffic will be detoured as follows:
    • Go south on NW 5 Avenue
    • Turn right onto westbound SR 916/NW 135 Street
    • Turn right onto northbound SR 7/US 441/NW 7 Avenue
    • Turn left onto westbound NW 151 Street

NW 167 Street

  • Ramp Closure: NW 167 Street to I-95, SR 9 and SR 7/US 441/NW 7 Avenue
    From Sunday, March 30 to Wednesday, April 3 between 10 p.m. and 5 a.m., the ramp from NW 167 Street to southbound I-95, SR 9 and SR 7/US 441/NW 7 Avenue will be closed and traffic will be detoured as follows:
    • Take the ramp to westbound SR 826/Palmetto Expressway
    • Exit at NW 12 Avenue and turn left onto southbound NW 12 Avenue
    • Turn left and take the ramp to eastbound SR 826/Palmetto Expressway
    • Take the ramp to southbound I-95 and SR 7/US 441/NW 7 Avenue

NW 6 Avenue

  • Around-the-clock Full Closure: NW 6 Avenue between NW 151 Street and NW 162 Street
    Drivers and pedestrians who want to go north onto NW 6 Avenue from the intersection of NW 151 Street and NW 6 Avenue will be detoured as follows:
    • Go east along NW 151 Street
    • Turn right onto southbound South Biscayne River Drive
    • Take the third exit at the roundabout onto northbound North Miami Avenue
    • Turn left onto northbound Memorial Highway, which converts to NW 2 Avenue
    • Continue north along NW 2 Avenue to NW 165 Street
  • Drivers and pedestrians who want to go south onto NW 6 Avenue from the intersection of NW 165 Street and NW 2 Avenue will be detoured as follows:
    • Continue south along NW 2 Avenue, which converts to Memorial Highway
    • Turn right onto southbound North Miami Avenue
    • Turn right onto northbound South Biscayne River Drive
    • Turn left onto westbound NW 151 Street
    • Continue west along NW 151 Street to NW 6 Avenue

Project Progress

Below is a photograph facing south of the recent concrete bridge deck installation along the future southbound Turnpike Connector ramp, which connects Florida’s Turnpike and SR 826/Palmetto Expressway to southbound I-95 and SR 7/US 441/NW 7 Avenue.

Teal 5 Bridge Approach Slab 2 Concrete Pour

Join Us in the Community

Friday, April 4
11 a.m. to 1 p.m.
Family Dollar
14941 NW 7 Avenue
Miami, FL 33168

Meet team members and learn the latest about the GGI Project, including upcoming work and lane closures. Ask questions and stay in the know. 

GGI Pop up 3 7 2025 12 crop