Opens in a new tab

Important: Northbound I-95 Exit Ramp to NW 2 Ave is Now at Exit 12B

Week of August 10, 2025

Project Closures

Map closure August 08 -2025
  • lane closure icon

    Lane Closure

  • local traffic only icon

    Detour

  • new traffic pattern icon

    New Traffic Pattern

Check Live Map

The following closures are scheduled between Sunday, August 10 and Friday, August 15. These closures will allow crews to perform bridge work, roadway paving, drainage work and temporary concrete barrier wall installation.

🌐 Check out all the project details at www.Go-GGI.com.
👉 Follow our social media page on 𝕏 @GoGGI_FDOT for the latest updates.

I-95

  • Around-the-clock Closure: southbound I-95 Express Ramp from GGMTF
    Ongoing until Monday, August 25 at 5 a.m., the southbound I-95 express lane ramp from the Golden Glades Multimodal Transportation Facility (GGMTF) is closed and traffic is directed to use the general purpose lanes at NW 151 Street.
  • Full Closure: southbound I-95 at Exit 12 (NW 171 Street)
    On Tuesday, August 12 between 11 p.m. and 5 a.m., all lanes along southbound I-95 will be closed at Exit 12 and traffic will be detoured as follows:
    • Take the ramp onto southbound SR 7/US 441/NW 7 Avenue
    • Turn left onto eastbound SR 916/NW 135 Street
    • Take the ramp onto southbound I-95
  • Full Closure: northbound I-95 at SR 916/NW 135 Street
    On Thursday, August 14 between 10 p.m. and 5 a.m., all lanes along northbound I-95 will be closed at SR 916/NW 135 Street and traffic will be detoured as follows:
    • Exit at SR 916/NW 135 Street and go north on NW 6 Avenue
    • Turn left onto westbound SR 916/Opa-locka Boulevard
    • Turn right onto northbound SR 7/US 441/NW 7 Avenue
    • Take the ramp to eastbound SR 826 Beaches/NW 167 Street
    • Turn left onto northbound SR 915/NE 6 Avenue
    • Turn right onto eastbound SR 860/NW 183 Street/Miami Gardens Drive
    • Take the ramp onto northbound I-95
  • Closure: northbound and southbound I-95 Express Lanes
    From Sunday, August 10 to Friday, August 15 between 11 p.m. and 5 a.m., drivers who want to take the northbound and southbound I-95 Express Lanes between NW 30 Street and SR 860/NE 183 Street/Miami Gardens Drive will be detoured to use the general purpose lanes along I-95.
  • Around-the-clock Ramp Closure: northbound I-95 exit to NW 151 Street
    The exit ramp from northbound I-95 onto NW 151 Street (Exit 11) remains closed through summer 2026. Traffic is directed to use the next exit ramp onto eastbound SR 826/NW 167 Street (Exit 12B) or also the previous exit onto SR 916/NW 135 Street (Exit 10B).
  • Lane Closures: I-95 between NW 135 Street and the Golden Glades Interchange
    • At 9 p.m., one lane in both directions will be closed nightly as needed
    • At 11 p.m., a second lane in both directions will be closed nightly as needed
    • All lanes will reopen at 5 a.m.

Florida’s Turnpike

  • Lane Closures: Florida’s Turnpike between SR 860/NW 183 Street/Miami Gardens Drive and I-95
    • From 9 p.m. to 5 a.m., up to two lanes in both directions will be closed nightly as needed

SR 826/Palmetto Expressway

  • Full Closure: eastbound SR 826/Palmetto Expressway at NW 7 Avenue Extension
    On Wednesday, August 13 between 10 p.m. and 5 a.m., all lanes along eastbound SR 826/Palmetto Expressway will be closed at NW 7 Avenue Extension and traffic will be detoured as follows:
    • Continue east and take the ramp to I-95 and southbound SR 7/US 441/NW 7 Avenue
    • Exit at SR 7/US 441/NW 7 Avenue and turn right onto northbound SR 7/US 441/NW 7 Avenue
    • Take the ramp to northbound SR 7/US 441/NW 2 Avenue
    • Continue north and make a left for NW 7 Avenue Extension
  • Full Closure: westbound SR 826/Palmetto Expressway at NW 7 Avenue Extension
    On Wednesday, August 13 between 10 p.m. and 5 a.m., all lanes along westbound SR 826/Palmetto Expressway will be closed at NW 7 Avenue Extension and traffic will be detoured as follows:
    • Take the ramp to northbound SR 7/US 441/NW 2 Avenue
    • Continue north on SR 7/US 441/NW 2 Avenue and turn left onto westbound SR 860/NW 183 Street/Miami Gardens Drive
    • Turn left onto southbound SR 817/NW 27 Avenue
    • Take the ramp to westbound SR 826/Palmetto Expressway
  • Lane Closures: SR 826/Palmetto Expressway between NW 12 Avenue and NW 7 Avenue Extension
    • At 9 p.m., one lane in both directions will be closed nightly as needed
    • At 11 p.m., a second lane in both directions will be closed nightly as needed
    • All lanes will reopen at 5 a.m.

SR 7/US 441/NW 7 Avenue

  • Ramp Closure: northbound SR 7/US 441/NW 7 Avenue to northbound I-95
    On Sunday, August 10 and Monday, August 11 between 10 p.m. and 5 a.m., the ramp from northbound SR 7/US 441/NW 7 Avenue to northbound I-95 will be closed and traffic will be detoured as follows:
    • Take the ramp to eastbound SR 826 Beaches/NW 167 Street
    • Turn left onto northbound SR 915/NE 6 Avenue
    • Turn right onto eastbound SR 860/NE 183 Street/Miami Gardens Drive
    • Take the ramp onto northbound I-95
  • Updated Traffic Pattern: SR 7/US 441/NW 7 Avenue between South Biscayne River Drive and Connector Road
    Northbound SR 7/US 441/NW 7 Avenue is reduced from two lanes to one lane, and southbound SR 7/US 441/NW 7 Avenue is reduced from three lanes to two lanes. The exclusive bicycle lane is temporarily unavailable during this work phase.

NW 151 Street

  • Full Closure: NW 151 Street at the I-95 bridge
    On Monday, August 11 between 9 p.m. and 5 a.m., NW 151 Street will be closed in both directions:
  • All lanes along eastbound NW 151 Street will be closed at the I-95 bridge and traffic will be detoured as follows:
    • Go south on SR 7/US 441/NW 7 Avenue
    • Turn left onto eastbound SR 916/NW 135 Street
    • Turn left onto northbound NW 5 Avenue
    • Turn right onto eastbound NW 151 Street
  • All lanes along westbound NW 151 Street will be closed at the I-95 bridge and traffic will be detoured as follows:
    • Go south on NW 5 Avenue
    • Turn right onto westbound SR 916/NW 135 Street
    • Turn right onto northbound SR 7/US 441/NW 7 Avenue
    • Turn left onto westbound NW 151 Street

NW 167 Street

  • Ramp Closure: NW 167 Street to I-95, SR 9 and SR 7/US 441/NW 7 Avenue
    From Tuesday, August 12 to Thursday, August 14 from 10 p.m. to 5 a.m., the ramp from NW 167 Street to southbound I-95, SR 9 and SR 7/US 441/NW 7 Avenue will be closed and traffic will be detoured as follows:
    • Take the ramp to westbound SR 826/Palmetto Expressway
    • Exit at NW 12 Avenue and turn left onto southbound NW 12 Avenue
    • Turn left and take the ramp to eastbound SR 826/Palmetto Expressway
    • Take the ramp to southbound I-95 and SR 7/US 441/NW 7 Avenue
  • Updated Traffic Pattern: NW 167 Street and NW 2 Avenue Intersection
    Northbound NW 2 Avenue is reduced to one exclusive left turn lane. This is a temporary configuration to continue reconstructing the Golden Glades Interchange.

SR 112/Airport Expressway

  • Lane Closures: SR 112/Airport Expressway between NW 22 Avenue and I-95
    • At 10 p.m., one lane in both directions will be closed nightly as needed
    • At 11 p.m., a second lane in both directions will be closed nightly as needed
    • All lanes will reopen at 5 a.m.

NW 171 Terrace

  • Around-the-clock Full Closure: NW 171 Terrace
    NW 171 Terrace between NW 2 Court and NW 2 Avenue remains closed around the clock through summer 2025 for overhead bridge work. Traffic is being detoured to NW 7 Avenue Extension.

NW 6 Avenue

  • Around-the-clock Full Closure: NW 6 Avenue between NW 147 Street and NW 151 Street
    Northbound NW 6 Avenue between NW 147 Street and NW 151 Street remains closed around the clock until Wednesday, August 13, 2025. Traffic along northbound NW 6 Avenue, which is a one-way road, is directed to take eastbound NW 147 Street and turn left onto northbound NW 5 Avenue to access NW 151 Street.
  • Around-the-clock Full Closure: NW 6 Avenue between NW 151 Street and NW 162 Street
    Drivers and pedestrians who want to go north onto NW 6 Avenue from the intersection of NW 151 Street and NW 6 Avenue will be detoured as follows:
    • Go east along NW 151 Street
    • Turn right onto southbound South Biscayne River Drive
    • Take the third exit at the roundabout onto northbound North Miami Avenue
    • Turn left onto northbound Memorial Highway, which converts to NW 2 Avenue
    • Continue north along NW 2 Avenue to NW 165 Street
  • Drivers and pedestrians who want to go south onto NW 6 Avenue from the intersection of NW 165 Street and NW 2 Avenue will be detoured as follows:
    • Continue south along NW 2 Avenue, which converts to Memorial Highway
    • Turn right onto southbound North Miami Avenue
    • Turn right onto northbound South Biscayne River Drive
    • Turn left onto westbound NW 151 Street
    • Continue west along NW 151 Street to NW 6 Avenue

Project Progress

Below is a photograph facing south of the ongoing reconstruction work for northbound I-95 widening including reconfiguring the exit ramp to NW 151 Street.

Photograph facing south of the ongoing reconstruction work for northbound I-95 widening including reconfiguring the exit ramp to NW 151 Street (August 2025).

Join Us in the Community

Friday, August 8
11 a.m. to 1 p.m.
Family Dollar
14941 NW 7 Avenue
Miami, FL 33168

Tuesday, August 12
11 a.m. to 1 p.m.
Walmart
1425 NE 163 Street
North Miami Beach, FL 33162

Tuesday, August 12
5 p.m. to 8 p.m.
City of North Miami Beach Back to School Fair
Ronald A. Silver Youth Enrichment Services (YES) Center
17051 NE 19 Avenue
North Miami Beach, FL 33162

Friday, August 15
9 a.m. to 11 a.m.
Krispy Kreme
530 NE 167 Street
Miami, FL 33162

Meet team members and learn the latest about the GGI Project, including upcoming work and lane closures. Ask questions and stay in the know.

Senior Community Outreach Specialist Sergies at the Family Dollar and Outreach Support Specialist Jose behind the camera at the pop-up event on May 2, 2025.