The following closures are scheduled between Sunday, April 14, and Saturday, April 20.
All lanes and ramps will reopen at 5 a.m. These closures will allow crews to perform bridge work, roadway paving, traffic shifts and temporary concrete barrier wall installation.
I-95
- Ramp Closure: northbound I-95 to westbound Palmetto Expressway
From Sunday, April 14 to Saturday, April 20, from 11 p.m. to 5 a.m., the ramp from northbound I-95 to westbound Palmetto Expressway will be closed, and traffic will be detoured as follows:- Continue north on I-95 and take the ramp to SR 7/US 441/NW 2 Avenue
- Continue north on NW 2 Avenue and turn left onto westbound NW 183 Street/Miami Gardens Drive
- Turn left onto southbound NW 27 Avenue
- Take the ramp to westbound Palmetto Expressway
- Ramp Closure: westbound NW 167 Street to westbound Palmetto Expressway
From Sunday, April 14 to Saturday, April 20, from 11 p.m. to 5 a.m., the ramp from NW 167 Street to westbound Palmetto Expressway will be closed, and traffic will be detoured as follows:- Take the ramp to northbound SR 7/US 441/NW 2 Avenue
- Continue north on NW 2 Avenue and turn left onto westbound NW 183 Street/Miami Gardens Drive
- Turn left onto southbound NW 27 Avenue
- Take the ramp to westbound Palmetto Expressway
- Ramp Closure: northbound I-95 to NW 167 Street
On Monday, April 15 to Thursday, April 18, from 11 p.m. to 5 a.m., the ramp from northbound I-95 to NW 167 Street will be closed, and traffic will be detoured as follows:- Continue north on I-95 and take the ramp to SR 7/US 441/NW 2 Avenue
- Turn left onto westbound NW 7 Avenue Extension
- Continue west for westbound Palmetto Expressway
- Exit at NW 12 Avenue and turn left onto southbound NW 12 Avenue
- Turn left onto eastbound NW 167 Street and take the ramp for eastbound Palmetto Expressway
- Exit at SR 826 Beaches for NW 167 Street
- Ramp Closure: Opa-locka Boulevard to northbound I-95
From Monday, April 15 to Thursday, April 18, from 11:59 p.m. to 5 a.m., the ramp from Opa-locka Boulevard to northbound I-95 will be closed and traffic will be detoured as follows:- Go north on SR 7/US 441/NW 7 Avenue
- Take the ramp for northbound I-95 at the Golden Glades Interchange
- Lane Closures: I-95 between NW 135 Street and the Golden Glades Interchange
- From 11 p.m. to 5 a.m., up to two lanes in both directions will be closed nightly as needed
Florida’s Turnpike
- Ramp Closure: southbound Turnpike to southbound I-95
From Sunday, April 14 to Thursday, April 18, from 11 p.m. to 5 a.m., the ramp from southbound Turnpike to southbound I-95 will be closed, and traffic will be detoured as follows:- Continue south on the Turnpike to exit at NW 167 Street
- Turn right onto southbound NE 6 Avenue
- Turn right onto westbound Opa-locka Boulevard
- Take the ramp for southbound I-95
- Lane Closures: Turnpike between NW 183 Street/Miami Gardens Drive and I-95
- From 9 p.m. to 5 a.m., up to two lanes in both directions will be closed nightly as needed
Palmetto Expressway
- Ramp Closure: eastbound Palmetto Expressway to southbound I-95
On Sunday, April 14 and Thursday, April 18, from 11 p.m. to 5 a.m., the ramp from eastbound Palmetto Expressway to southbound I-95 will be closed, and traffic will be detoured as follows:- Continue east on Palmetto Expressway to NW 7 Avenue Extension
- Turn right onto SR 7/US 441/NW 2 Avenue
- Take the ramp for southbound I-95
- Ramp Closure: eastbound Palmetto Expressway to NW 167 Street
From Monday, April 15 to Saturday, April 20, from 11 p.m. to 5 a.m., the ramp from eastbound Palmetto Expressway to NW 167 Street will be closed, and traffic will be detoured as follows:- Continue east and take the ramp to I-95 and southbound SR 7/US 441/NW 7 Avenue
- Exit at NW 7 Avenue and turn right onto northbound NW 7 Avenue
- Take the ramp to SR 826 Beaches for NW 167 Street
- Ramp Closure: eastbound Palmetto Expressway to NW 7 Avenue Extension
From Monday, April 15 to Saturday, April 20, from 11 p.m. to 5 a.m., the ramp from eastbound Palmetto Expressway to NW 7 Avenue Extension will be closed, and traffic will be detoured as follows:- Take the ramp to I-95 and southbound SR 7/US 441/NW 7 Avenue
- Exit at NW 7 Avenue and turn right onto northbound NW 7 Avenue
- Take the ramp to northbound SR 7/US 441/NW 2 Avenue
- Continue north and make a left for NW 7 Avenue Extension
- Ramp Closure: eastbound Palmetto Expressway to northbound Turnpike
From Monday, April 15 to Saturday, April 20, from 11 p.m. to 5 a.m., the ramp from eastbound Palmetto Expressway to northbound Turnpike will be closed, and traffic will be detoured as follows:- Continue east and take the ramp to I-95 and southbound SR 7/US 441/NW 7 Avenue
- Exit at NW 7 Avenue and turn right onto northbound NW 7 Avenue
- Take the ramp to northbound SR 7/US 441/NW 2 Avenue
- Continue north and make a left onto westbound NW 7 Avenue Extension
- Take the ramp to northbound Turnpike
- Lane Closures: Palmetto Expressway between NW 12 Avenue and NW 7 Avenue Extension
- At 9 p.m., one lane in both directions will be closed nightly as needed
- At 11 p.m., a second lane in both directions will be closed nightly as needed
- All lanes will reopen at 5 a.m.
SR 9
- Traffic Shift: northbound SR 9 to the Golden Glades Interchange
On Tuesday, April 16, at 5 a.m., northbound SR 9 will be reduced from two travel lanes to one travel lane between Connector Road and the Golden Glades Interchange. This new traffic pattern will remain in place for several months.
- Ramp Closure: northbound SR 9 to the Golden Glades Interchange
On Monday, April 15 and Thursday, April 18, from 11 p.m. to 5 a.m., the ramp from northbound SR 9 to the Golden Glades Interchange will be closed from NW 27 Avenue to the Golden Glades Interchange, and traffic will be detoured as follows:- Go east on Opa-locka Boulevard
- Take the ramp onto northbound I-95
- Ramp Closure: northbound SR 9 to westbound Palmetto Expressway
From Monday, April 15 to Saturday, April 20, from 11 p.m. to 5 a.m., the ramp from northbound SR 9 to westbound Palmetto Expressway will be closed, and traffic will be detoured as follows:- Continue north and take the ramp to northbound SR 7/US 441/NW 2 Avenue
- Stay north on NW 2 Avenue and turn left onto westbound NW 183 Street/Miami Gardens Drive
- Turn left onto southbound NW 27 Avenue
- Take the ramp to westbound Palmetto Expressway
- Ramp Closure: northbound SR 9 to northbound Turnpike
From Monday, April 15 to Saturday, April 20, from 11 p.m. to 5 a.m., the ramp from northbound SR 9 to northbound Turnpike will be closed, and traffic will be detoured as follows:- Continue north and take the ramp to northbound SR 7/US 441/NW 2 Avenue
- Turn left onto westbound NW 7 Avenue Extension
- Take the ramp to northbound Turnpike
SR 7/US 441/NW 7 Avenue
- Ramp Closure: northbound SR 7/US 441/NW 7 Avenue to the Golden Glades Interchange
On Monday, April 15 and Thursday, April 18, from 11 p.m. to 5 a.m., the ramp from northbound NW 7 Avenue to the Golden Glades Interchange will be closed, and traffic will be detoured as follows:- Go south on SR 7/US 441/NW 7 Avenue
- Turn left onto eastbound Opa-locka Boulevard
- Take the ramp onto northbound I-95
- Ramp Closure: northbound SR 7/US 441/NW 7 Avenue to westbound Palmetto Expressway
From Monday, April 15 to Saturday, April 20, from 11 p.m. to 5 a.m., the ramp from NW 7 Avenue to westbound Palmetto Expressway will be closed, and traffic will be detoured as follows:- Continue north and take the ramp to northbound SR 7/US 441/NW 2 Avenue
- Continue north on NW 2 Avenue and turn left onto westbound NW 183 Street/Miami Gardens Drive
- Turn left onto southbound NW 27 Avenue
- Take the ramp to westbound Palmetto Expressway
- Ramp Closure: northbound SR 7/US 441/NW 7 Avenue to northbound Turnpike
From Monday, April 15 to Saturday, April 20, from 11 p.m. to 5 a.m., the ramp from NW 7 Avenue to northbound Turnpike will be closed, and traffic will be detoured as follows:- Continue north and take the ramp to northbound SR 7/US 441/NW 2 Avenue
- Turn left onto westbound NW 7 Avenue Extension
- Take the ramp to northbound Turnpike
Project Progress
Below is a photograph of concrete pile foundation work taking place on the east end of the GGI Project.