The following closures are scheduled between Sunday, April 7 and Friday, April 12. Construction crews are establishing new work zones within the project limits.
I-95
- Ramp Closure: northbound I-95 to westbound Palmetto Expressway
On Wednesday, April 10 and Thursday, April 11, from 11:59 p.m. to 5 a.m., the ramp from northbound I-95 to westbound Palmetto Expressway will be closed, and traffic will be detoured as follows:- Continue north on I-95 and take the ramp to SR 7/US 441/NW 2 Avenue
- Turn left onto westbound NW 7 Avenue Extension
- Continue west for westbound Palmetto Expressway
- Ramp Closure: Opa-locka Boulevard to northbound I-95
On Thursday, April 11 and Friday, April 12, from 11:59 p.m. to 5 a.m., the ramp from Opa-locka Boulevard to northbound I-95 will be closed and traffic will be detoured as follows:- Go north on SR 7/US 441/NW 7 Avenue
- Take the ramp for northbound I-95 at the Golden Glades Interchange
- Lane Closures: I-95 between NW 135 Street and the Golden Glades Interchange
- From 11 p.m. to 5 a.m., up to two lanes in both directions will be closed nightly as needed
Florida’s Turnpike
- Ramp Closure: southbound Turnpike to southbound I-95
From Sunday, April 7 to Thursday, April 11, from 11:59 p.m. to 5 a.m., the ramp from southbound Turnpike to southbound I-95 will be closed, and traffic will be detoured as follows:- Continue south on the Turnpike to exit at NW 167 Street
- Turn right onto southbound NE 6 Avenue
- Turn right onto westbound Opa-locka Boulevard
- Take the ramp on the left-hand side for southbound I-95
- Lane Closures: Turnpike between NW 183 Street/Miami Gardens Drive and I-95
- From 9 p.m. to 5 a.m., up to two lanes in both directions will be closed nightly as needed
Palmetto Expressway
- Ramp Closure: eastbound Palmetto Expressway to southbound I-95
From Sunday, April 7 to Thursday, April 11, from 11:59 p.m. to 5 a.m., the ramp from eastbound Palmetto Expressway to southbound I-95 will be closed, and traffic will be detoured as follows:- Continue east on Palmetto Expressway to NW 7 Avenue Extension
- Turn right onto SR 7/US 441/NW 2 Avenue
- Take the ramp on the left-hand side for southbound I-95
- On Monday, April 8, at 5 a.m., traffic will be shifted to the left on the ramp from eastbound Palmetto Expressway to southbound I-95. Thursday, April 11 is an alternate date for the traffic shift.
- On Friday, April 12, at 5 a.m., traffic will be shifted to the right on the Palmetto Expressway in both directions between NW 8 Avenue and NW 7 Avenue Extension.
- Lane Closures: Palmetto Expressway between NW 12 Avenue and NW 7 Avenue Extension
- At 9 p.m., one lane in both directions will be closed nightly as needed
- At 11 p.m., a second lane in both directions will be closed nightly as needed
- All lanes will reopen at 5 a.m.
SR 9
- Ramp Closure: northbound SR 9 to westbound Palmetto Expressway and northbound Turnpike
On Wednesday, April 10 and Thursday, April 11, from 11:59 p.m. to 5 a.m., the ramp from eastbound Palmetto Expressway to southbound I-95 will be closed, and traffic will be detoured as follows:- Continue east on Palmetto Expressway to NW 7 Avenue Extension
- Turn right onto SR 7/US 441/NW 2 Avenue
- Take the ramp on the left-hand side for southbound I-95
Project Progress
Below is a photograph of the work taking place on the ramp from eastbound Palmetto Expressway to southbound I-95.