Opens in a new tab

Important: Northbound I-95 Exit Ramp to NW 2 Ave is Now at Exit 12B

Northbound Turnpike Connector Continuous Closure Starts Friday, April 24

Back to all News & Events
NB TPK CONN Closure - April 22-thumb

What/Where:  The ramps from northbound I-95, S.R. 9 and S.R. 7/U.S. 441/NW 7 Avenue to westbound S.R. 826/Palmetto Expressway and northbound Florida’s Turnpike will be temporarily closed around the clock.

When: From Friday, April 24 at 10 p.m. continuously until Monday, April 27 at 5 a.m.

Who/Why: The GGI Project contractor will be installing stormwater drainage pipes.

Detour routes:

  • The ramp from northbound I-95 to westbound S.R. 826/Palmetto Expressway will be closed and traffic will be detoured as follows:
    • Continue north along I-95 and take the ramp to S.R. 7/U.S. 441/NW 2 Avenue
    • Turn left onto westbound NW 7 Avenue Extension
    • Continue west for westbound S.R. 826/Palmetto Expressway

  • The ramp from northbound I-95 to northbound Florida’s Turnpike will be closed and traffic will be detoured as follows:
    • Continue north along I-95 and take the ramp to S.R. 7/U.S. 441/NW 2 Avenue
    • Turn left onto westbound NW 7 Avenue Extension
    • Take the ramp to northbound Florida’s Turnpike

  • The ramp from S.R. 9 and S.R. 7/U.S. 441/NW 7 Avenue to westbound S.R. 826/Palmetto Expressway will be closed and traffic will be detoured as follows:
    • Continue north and take the ramp to northbound S.R. 7/U.S. 441/NW 2 Avenue
    • Turn left onto westbound NW 7 Avenue Extension
    • Continue west on NW 7 Avenue Extension for westbound S.R. 826/Palmetto Expressway

  • The ramp from S.R. 7/U.S. 441/NW 7 Avenue and S.R. 9 to northbound Florida’s Turnpike will be closed and traffic will be detoured as follows:
    • Continue north and take the ramp to northbound S.R. 7/U.S. 441/NW 2 Avenue
    • Turn left onto westbound NW 7 Avenue Extension
    • Take the ramp to northbound Florida’s Turnpike

Share on: