Golden Glades Interchange (GGI) Project Update

Week of May 5, 2024

top-content:1
Featured Image

The following closures are scheduled between Sunday, May 5, and Friday, May 10. 

All lanes and ramps will reopen at 5 a.m. These closures will allow crews to perform bridge work, roadway paving and temporary concrete barrier wall installation.

I-95

  • Ramp Closure: northbound I-95 to NW 167 Street
    From Sunday, May 5, to Friday, May 10, from 11 p.m. to 5 a.m., the ramp from northbound I-95 to NW 167 Street will be closed, and traffic will be detoured as follows:
    • Continue north on I-95 and take the ramp to SR 7/US 441/NW 2 Avenue
    • Turn left onto westbound NW 7 Avenue Extension
    • Continue west for westbound Palmetto Expressway
    • Exit at NW 12 Avenue and turn left onto southbound NW 12 Avenue
    • Turn left onto eastbound NW 167 Street and take the ramp for eastbound Palmetto Expressway
    • Exit at SR 826 Beaches for NW 167 Street
  • Ramp Closure: southbound I-95 to southbound SR 7/US 441/NW 7 Avenue and southbound SR 9
    From Sunday, May 5, to Friday, May 10, from 11 p.m. to 5 a.m., the ramp from southbound I-95 to SR 7/US 441/NW 7 Avenue and SR 9 will be closed, and traffic will be detoured as follows:
    • Continue south on I-95
    • Exit at Opa-locka Boulevard and turn right onto westbound Opa-locka Boulevard
    • Turn left onto southbound SR 7/US 441/NW 7 Avenue
    • Or continue west and turn right onto northbound NW 22 Avenue or turn right onto northbound NW 27 Avenue
  • Closure: southbound and northbound I-95 managed lanes
    From Sunday, May 5, to Friday, May 10, from 11 p.m. to 5 a.m., drivers who want to take the northbound and southbound I-95 managed lanes between NW 30 Street and NW 183 Street/Miami Gardens Drive, will be directed to use the general purpose lanes along I-95.
  • Lane Closures: I-95 between NW 135 Street and the Golden Glades Interchange
    • From 11 p.m. to 5 a.m., up to two lanes in both directions will be closed nightly as needed

Florida’s Turnpike

  • Lane Closures: Turnpike between NW 183 Street/Miami Gardens Drive and I-95
    • From 9 p.m. to 5 a.m., up to two lanes in both directions will be closed nightly as needed
  • No impact to tolling operations anticipated

Palmetto Expressway

  • Lane Closures: Palmetto Expressway between NW 12 Avenue and NW 7 Avenue Extension
    • At 9 p.m., one lane in both directions will be closed nightly as needed
    • At 11 p.m., a second lane in both directions will be closed nightly as needed
    • All lanes will reopen at 5 a.m.

SR 9

  • Ramp Closure: northbound SR 9 to the interchange
    From Sunday, May 5, to Friday, May 10, from 11 p.m. to 5 a.m., the ramp from northbound SR 9 to the interchange will be closed, and traffic will be detoured as follows:
    • Go east on Opa-locka Boulevard 
    • Take the ramp onto northbound I-95
  • Ramp Closure: the interchange to southbound SR 9
    From Sunday, May 5, to Friday, May 10, from 11 p.m. to 5 a.m., the ramp from the interchange to southbound will be closed, and traffic will be detoured as follows:
    • Take the ramp to southbound I-95
    • Exit at Opa-locka Boulevard and turn right onto westbound Opa-locka Boulevard
    • Turn right onto northbound NW 22 Avenue or continue west and turn right onto northbound NW 27 Avenue

SR 7/US 441/NW 7 Avenue

  • Ramp Closure: northbound SR 7/US 441/NW 7 Avenue to the interchange
    From Sunday, May 5, to Friday, May 10, from 11 p.m. to 5 a.m., the ramp from NW 7 Avenue to the interchange will be closed, and traffic will be detoured as follows:
    • Go south on SR 7/US 441/NW 7 Avenue
    • Turn left onto eastbound Opa-locka Boulevard
    • Take the ramp onto northbound I-95
  • Ramp Closure: the interchange to southbound SR 7/US 441/NW 7 Avenue
    From Sunday, May 5, to Friday, May 10, from 11 p.m. to 5 a.m., the ramp from NW 7 Avenue to northbound Turnpike will be closed, and traffic will be detoured as follows:
    • Take the ramp to southbound I-95
    • Exit at Opa-locka Boulevard and turn right onto westbound Opa-locka Boulevard
    • Turn left onto southbound SR 7/US 441/NW 7 Avenue

NW 167 Street

  • Ramp Closure: NW 167 Street to southbound SR 7/US 441/NW 7 Avenue
    From Sunday, May 5, to Friday, May 10, from 11 p.m. to 5 a.m., the ramp from NW 167 Street to southbound SR 7/US 441/NW 7 Avenue will be closed, and traffic will be detoured as follows:
    • Take the ramp to southbound I-95
    • Exit at Opa-locka Boulevard and turn right onto westbound Opa-locka Boulevard
    • Turn left onto southbound SR 7/US 441/NW 7 Avenue
  • Ramp Closure: NW 167 Street to southbound SR 9
    From Sunday, May 5, to Friday, May 10, from 11 p.m. to 5 a.m., the ramp from NW 167 Street to southbound SR 9 will be closed, and traffic will be detoured as follows:
    • Take the ramp to southbound I-95
    • Exit at Opa-locka Boulevard and turn right onto westbound Opa-locka Boulevard
    • Turn right onto northbound NW 22 Avenue or continue west and turn right onto northbound NW 27 Avenue

Upcoming Hybrid Public Meeting

Join us in person or virtually on Thursday, May 9 at 6 p.m. for a GGI Project public meeting to learn more about the improvements and what to expect during construction.

Click here for details.

Project Progress

Below is a photograph facing south of the work taking place to build a new flyover ramp to connect eastbound Palmetto Expressway to northbound I-95.

Photograph facing south of the work taking place to build a new flyover ramp to connect eastbound Palmetto Expressway to northbound I-95

About the Project

The GGI Project spans more than 10 miles of roadway and ramps and will enhance regional mobility and reduce travel times by revitalizing this major transportation interchange, which includes connections to five essential roadway systems in the South Florida area: State Road (SR) 9A/I-95, SR 826/Palmetto Expressway, SR 91/Florida’s Turnpike, SR 9 and SR 7/US 441/NW 7 Avenue.

Please note that this schedule may change due to bad weather or other unexpected conditions.

For additional information, please contact Senior Community Outreach Specialist Sergies Duarte at (305) 588-6399 or Sergies.Duarte@dot.state.fl.us. For more information about this project, please visit www.Go-GGI.com.

Real-time lane closure information will be available to drivers through their preferred navigation apps such as Google Maps, Apple Maps and Waze.

Drivers are also encouraged to log on to www.fl511.com before they travel to get real-time traffic and lane closure information.

Copyright © 2024 Golden Glades Interchange (GGI) Project, All rights reserved.